Mascot Case Study

trend-1-500

Trend Controls – Horsham, UK

10/02/2014 |

For our through-hole work, we originally had carousels but with no visual aids for our operators. We therefore had to rely on our experienced operators’ expertise and memories. Everything was a manual process, including the selection of the program for build. There were many mistakes leading to incorrectly built PCBs. Our training was based on product knowledge, which meant it could take up t...

read more...

danlers

Danlers Ltd – Chippenham, UK

|

"Prior to having our Mascot stations installed, we built all our through-hole assemblies following paper based work instructions with the component parts stored in different pots on the desk. Occasionally we’d use flip jigs, if that was possible. A...

read more...

Tech News

23
Jan
Robotas Technologies Becomes SMTA Corporate Member
We are very pleased to announce that Robotas Technologies are now Corporate Members of the Surface M...

read more...

23
Jun
Robotas USA Trip – June 2015
Robotas are in the middle of a 10 day trip around the USA visiting customers with our USA Agents EAP...

read more...

Google+

Connect with us on Google+